One guided field record
Photos, weather, work performed, timecards, equipment, deliveries, observations, and the daily survey stay in one report instead of separate texts and spreadsheets.
Clerxi’s AI daily report software turns field photos, crew hours, equipment, deliveries, weather, and work logs into a structured draft that a foreman reviews, signs, and submits. The final record stays human-controlled.
Capture the day once. Clerxi organizes the evidence, checks for missing details, connects excavation work to the right cleared activity, and produces a signed report the office can use.
Photos, weather, work performed, timecards, equipment, deliveries, observations, and the daily survey stay in one report instead of separate texts and spreadsheets.
Generate a factual narrative or structured draft from the day’s captured evidence, then review and edit it before anything is signed.
A pre-submit check highlights incomplete or inconsistent sections and lets the user jump back to the exact place that needs attention.
The submitted report preserves the signer, field evidence, project context, and downstream links needed by project, safety, and claim workflows.
Every step keeps the source, decision, and output connected so a reviewer can understand what happened and why.
Add field photos, progress, labor, equipment, deliveries, weather, delays, and observations from the same project record.
Ask Clerxi to assemble a factual summary or structured draft from the information already entered—without inventing the day.
Review completeness findings, connect excavation work to the correct cleared activity when required, and correct the source section.
The responsible user certifies accuracy, applies a signature, submits the report, and produces an editorial PDF for the project record.
| Capability | How Clerxi handles it | Control |
|---|---|---|
| Photos-first capture | Field evidence is attached to the report and its relevant section. | User-reviewed |
| AI narrative and structured draft | Drafts from captured report data and remains editable before sign-off. | Entitlement-gated |
| Pre-submit completeness | Surfaces findings and returns the user to the affected section. | Acknowledged by user |
| Excavation submit gate | Requires the report to link to an eligible excavation activity when applicable. | Server-enforced |
| Signature and certification | Captures signer name, signature, and certification at submission. | Required |
| Editorial PDF and distribution | Produces a consistent report output and supports managed recipients. | Permission-gated |
Field evidence is attached to the report and its relevant section.
Drafts from captured report data and remains editable before sign-off.
Surfaces findings and returns the user to the affected section.
Requires the report to link to an eligible excavation activity when applicable.
Captures signer name, signature, and certification at submission.
Produces a consistent report output and supports managed recipients.
No. AI can draft a narrative, build structured sections, and run a completeness check, but a user reviews the record, certifies it, and signs before submission.
Photos can be captured and organized inside the report, and the AI-assisted draft can use the report’s field data. The user still confirms the resulting narrative and sections.
The pre-submit check identifies findings and can send the user back to the relevant step. Required project rules can also prevent submission until the missing connection is resolved.
Clerxi supports the GC submit-time signature and a separate permission-controlled inspector or engineer sign-off path for assigned project participants.
Clerxi’s heavy equipment maintenance software combines preventive maintenance schedules, work orders, readiness reasons, parts, downtime, and return-to-service controls in one fleet workflow. Managers see what is due, what is blocked, and what must happen before a machine goes back to work.
Explore the workflowClerxi’s certified payroll software turns project, worker, time, rate, fringe, and deduction records into reviewable weekly payroll reports and downloadable WH-347 PDFs. Contractors can route deficiencies, collect approvals, record agency submission, and keep the audit trail together.
Explore the workflowBring one project, one weekly report, or one machine. We’ll map the process against the way your team works today.
Book a working session