How much are gaps costing you?
Two minutes. No signup. The full operational footprint Clerxi covers — direct compliance plus indirect savings — modeled against your operation.
Estimated annual recovery potential
- Lost to missed deadlinesi1.8% of contract volume — public-works industry benchmark from claims preserved across pilot customers. ClaimNavigator™ catches the 5-day notice, the CO window, the DRB filing.ClaimNavigator™ · Public works benchmark$720,000
- Penalty exposure pre-emptediDAS / OSHA / DBA penalty exposure averaged across pilot customers; saturates with portfolio size (sqrt scaling on project count).DAS · OSHA · DBA$84,749
- Insurance renewal savingsiBroker's market activity is visible in real time — no last-minute renewal surprises. ~5% of premium saved through transparent shopping. Modeled at 0.06% of revenue.Transparent broker shopping$24,000
- Wage-claim defense avoidediGPS-stamped, geo-fenced timesheets defeat false / exaggerated wage claims at the door. Defense alone runs $20–50k per claim. Modeled at $8k per project, capped at $200k.GPS geo-fenced timesheets$80,000
- OSHA inspection readinessiOSHA 300 / 300A / 301 logs always current. RiskScore™ data ready. Penalties for incomplete logs disappear; inspection cycles shorten. ~$5k per project, capped at $125k.300 log always current$50,000
- Crew + fleet dispatch efficiencyiTelematics + crew dispatch eliminate idle time, mis-dispatch, dead-haul. ~0.2% of revenue across crewed work.Telematics + dispatch$80,000
- Compliance ops automatediTiered savings: 60% (1–2 FTE) / 75% (3–5 FTE) / 85% (6+ FTE), applied to fully-loaded $85k FTE.Tiered by team size$102,000
Total recovery potential$1.14M
See this against your real dataEstimates from public-works benchmarks. Direct compliance + indirect operational. Bring your last project on the demo and we'll model it against your real loss runs.